Screenshot 2025-03-05 at 13.49.27

Mapping geohazards with drones and Pix4D

Drone mapping provides data for geotechnical investigation of major landslide—PIX4Dcloud supports collaboration & data sharing across teams.

In mountainous areas, geohazards such as rockfalls or landslides threaten transport routes. To create safe travel pathways, transportation agencies assess the natural landscape and topography before mountain roadways are constructed. This helps to mitigate these potential hazards and prevent road closures, road damage, and injuries. Even after construction, these roadways need to be monitored to ensure they are safe.

Using photogrammetry and drones to map these areas offers several benefits, such as high-resolution datasets, minimal (if any) traffic interruption, and more efficient data collection of real-time 3D data on the status of the site that would otherwise be dangerous and difficult to collect.

Screenshot 2025-03-04 at 12.30.53
Ground control point to anchor accurate drone mapping for geohazard assessment

Insights on geohazard mapping

Chinook Landscape Architecture focuses on trails, outdoor recreation, and river restoration. They also use modern technology, such as drones and photogrammetry, to solve complex design problems. We spoke with Jon Altschuld, the founder and principal, about his use of drones and Pix4D to tackle geohazards.

Jon shared details about a recent project.

Assessing the landslide impact with drones and photogrammetry

In June 2024, a major landslide destroyed a portion of Wyoming State Highway 22 on Teton Pass, a key route in the western United States. The Teton Pass area is part of the Rocky Mountains, known for its steep terrain and dramatic landscapes. This highway connects the mountain resort town of Jackson with neighboring communities, where the majority of the resort's workers live.

unnamed (7)
Aerial view of the massive landslide that destroyed Teton Pass

Mapping geohazards is very specialized as it generally requires flying the drone manually and flying very close to the subject, such as the rockface or slide area. Chinook has developed a specialty in this niche, they are one of the few service providers that are trusted with this type of work. They frequently work with the Department of Transportation (DOT) and the geotechnical engineers they hire. When Wyoming’s DOT hired one of these engineers, the engineer reached out to Chinook.

unnamed (8)
A panoramic view of the landslide shows the drone positioned at a ground control point, poised to take off and gather visual data

Challenges

Chinook faced several challenges: a short timeframe requiring immediate mobilization, an active construction and geohazard zone under heavy public scrutiny, and a difficult area to map manually. Coordinating three different local coordinate systems used by Wyoming’s DOT added complexity to aligning GCPs and ensuring correct data projection. Despite these hurdles, thorough planning—built on past experience—ensured they captured high-quality data without needing to re-fly or re-process anything.

LocationWyoming, USA
UserChinook Landcape Architecture
Area surveyedApprox. 70 acres
Images captured1,900 for larger area mapping. 650 for manual flights focused only on slide area
GSD1cm for larger area, 0.50cm for slide area

For each visit, post-slide and mid-construction, the team conducted a full day of flights. They processed the data overnight and during the return trip from the site, followed by office work that included cutting cross-sections and other analyses for the geotechnical investigation.

The larger area was mapped at a ground sample distance (GSD) of 1.00 cm, while manual flights focused on the landslide area, achieving a higher resolution of 0.50 cm GSD. These flights were particularly important, as they were flown in front of the slide to capture the vertical and overhanging faces—critical details that typical nadir flights often miss. The data was processed in PIX4Dmatic.

TP Cloud03 (1)
Reconstruction of the landslide in PIX4Dcloud, complete with critical markings for collaborative work

unnamed (6)
Integrating external data into PIX4Dcloud proved invaluable for efficient landslide mapping

The datasets provided geotechnical engineers with the detailed information they needed to assess post-emergency conditions quickly, determine the landslide’s potential causes, and evaluate repair options. Pix4D software delivered powerful processing capabilities, while PIX4Dcloud served as the central communication hub.

Its user-friendly design meant no special training was needed, so everyone on the project could use it, regardless of their tech experience. Plus, seamless export options between PIX4Dcloud and GIS platforms like QGIS allow teams to design in QGIS and bring their data into the cloud for shared collaboration.

TP Cloud04 (1)
Using PIX4Dcloud’s 2D/3D Comparison, this image highlights the construction work addressing the landslide’s aftermath and restoring the highway

The ability to mark up datasets in real time in PIX4Dcloud—integrating external data such as plansheets and borehole locations and generating cross-sections—proved invaluable for keeping the project moving efficiently. By enabling collaborative design and data sharing, PIX4Dcloud enhanced the overall project collaboration, ensuring that all stakeholders remain aligned throughout the process.

From original 1950s design sheets and USGS pre-slide data to current drone imagery and proposed repair plans, PIX4Dcloud enabled the team to bring together decades of data in one cohesive environment.

QGIS04C-MidConstruction (1)
Mid-construction view in QGIS using data processed with PIX4Dcloud, which brought together decades of information into one collaborative platform—no special training needed

Additionally, the 2D/3D comparison tool in PIX4Dcloud played a key role in monitoring progress along the highway. By overlaying historical flight data with newly captured imagery, the team could immediately visualize changes in the slope and road layout, helping to verify the progress of the repairs. This ongoing visual record ensured that everyone stayed informed about the project’s status and any necessary adjustments.

“Pix4D always has great processing software, and PIX4Dcloud really shined on this project as a collaboration and communication tool. Pix4D has been my go-to photogrammetry software since before starting Chinook 7 years ago." - Jon Altschuld, Principal, Chinook Landscape Architecture, LLC

The Teton Pass landslide case highlights how drones, photogrammetry, and PIX4Dcloud can address geotechnical challenges by capturing detailed data and sharing it among cross-disciplinary teams. By streamlining hazard assessment and repair planning, the project helped keep a critical highway open for local communities.


Manage construction projects with PIX4Dcloud
Collaboration and project management made easy!

Related articles